4/30/18
New fuse block wired up and mounted.
Lower leads tucked into the sheath with new block mounted in final position.
This was the only approach as there is no way in hell to get at those leads and insert them tucked down below the lip of this sheath. It took some doing but I got the leads to comply and tuck down in there. My biggest fear was having an end come loose and pop free after the fact. Thankfully it didn't happen and was pleasantly surprised with how they rest in there. Leaving well enough alone.
Moved onto the upper leads and took extra time and a few retries to arrange them in the smoothest and least stressed position that I could.
These are little longer than the originals but I have more adjustment slack to slip the main harness a little higher which is what I need to do next. Anyway the base or foundation is now set. Working outwards from here to get the rest of the harness into final clamped position.
Thanks for looking!
Justin
New fuse block wired up and mounted.
Lower leads tucked into the sheath with new block mounted in final position.
This was the only approach as there is no way in hell to get at those leads and insert them tucked down below the lip of this sheath. It took some doing but I got the leads to comply and tuck down in there. My biggest fear was having an end come loose and pop free after the fact. Thankfully it didn't happen and was pleasantly surprised with how they rest in there. Leaving well enough alone.
Moved onto the upper leads and took extra time and a few retries to arrange them in the smoothest and least stressed position that I could.
These are little longer than the originals but I have more adjustment slack to slip the main harness a little higher which is what I need to do next. Anyway the base or foundation is now set. Working outwards from here to get the rest of the harness into final clamped position.
Thanks for looking!
Justin
Comment