Originally posted by JTR70" post=22261
You can see in this picture that I've started repairing the tunnel sides. I had to remove 3 layers of Bubba metal welded onto the rusted tunnel. What a mess. I've read that the tunnel floor flanges sit lower than the longitudinal floor flanges by ~5/8" throughout the entirety of the tunnel's length. Can anyone verify this before I start on this area?
It reminds me of the old multiple choice tests we took as kids with the #2 pencil and how they'd get after you if you didn't fill in the answer dot completely!
I always hoped that taking those old tests would provide a practical application for me eventually.
Comment