I'm seeking help on how to finish off the transition from the top of the lock post (B-pillar)to the bottom leading edge of the quarter-window frame. This photo shows the position of the new B-pillar and quarter-panel patch.
Outside fabricated panel piece nearly ready to be tack welded.
Outside and inside fabricated panel pieces.
Comment